QuickCamp™ Provides Protection from Weather Elements on Job Sites

When it comes to getting the job done, weather can get in the way. The QuickCamp™ prevents that from happening. It’s an insulated, climate controlled shelter on site that provides a safe environment to carry out pipe fusions – rain or shine.

A construction site with large black pipes on green supports, a green container labeled McELROY, machinery, a generator, orange cones, and a portable toilet, set on wooden planks near a wooded area.

The QuickCamp shelter is a 20’ by 8’ container, that folds into a 21’8” x 24’ 7” temporary structure, and houses a hydraulically powered 1236/900 or 824/630 fusion carriage. The shelter can be purchase on its own or there is the option to get the entire QuickCamp System, which comes with a MegaMc® PolyHorse®, MegaMc® Rollers and Pipe Stands. Two people to get everything set-up within 30-minutes to so operators are ready to fuse pipe 8” IPS to 36” OD regardless of the weather conditions. 

A large green McElroy fusion machine holds a black plastic pipe in place at an outdoor construction site with wood chips on the ground and construction equipment in the background.

The MegaMc® PolyHorse has hydraulically powered racks that hold a day’s worth of pipe and allows one operator to load, align and fuse pipe via remote control in the shelter. This increases productivity by eliminating having to wait for heavy equipment to load pipe for each fusion joint.

The 2.5” thick, R15-rated insulated walls have a unique pipe seal help to regulate the inside temperature while two heating and air units allow operators to experience a comfortable work environment while maintaining the integrity of the fusion joint.  It is well-lit both inside and outside the shelter and there is enough space for a breakroom or storage.

Visit our dedicated QuickCamp page on our website to learn more.